Visual Inspection.
Two pipes re-heater damaged and are still attached can be seen from figure 3.3. Temporary conditions pipe 3 and 4 pipe received can be seen from figure 3.4 and 3.5.




A visual inspection then will be on pipe 3.The results can be seen from figure 3.6 to 3.12







From the results of a visual inspection a pipe number 3 can be drawn conclusions as follows:
1 .Find any thinning of the walls of the pipe of the outer being allegedly caused by erosion.
2 .Find any torn on a pipe that has least thickness , allegedly caused by no longer able to withstand pressure from in a pipe.
3 .Not the wall found the occurrence of depletion of passage in a tubular.
4 .There was no evidence excessive deposit on an area of around torn.
5 .Not findings of the damaged due to corrosion in passage in a tubular , pitting as corrosion , caustic corrosion and kind of corrosion that endangers the other

Continue to Boiler Tube Research (Re-Heater) Part 3.

8 comments:

  1. This side is very helpful Boiler Tube Research. live soccer

    ReplyDelete
  2. Thanks for your great post.This post obviously very helpful. Already I bookmark this website. xnxx

    ReplyDelete
  3. This post is very informative & effective for human. Thanks for your good post.
    mentalist

    ReplyDelete
  4. This post is very informative & effective for human. Thanks for your good post.
    mentalist

    ReplyDelete
  5. It is a helpful post for industrial work who's are use boiler in their mills&factories thanks for this useful posttelepathy show

    ReplyDelete
  6. It is a helpful post for industrial work who's are use boiler in their mills&factories thanks for this useful posttelepathy show

    ReplyDelete
  7. thanks the article succes always for website

    ReplyDelete