Friday, October 2, 2015

Boiler Flushing after contaminated from sea water

It was beginning from start up that ventilator valve was not close so that steam was shoot to condenser tubes until broken. Almost 2 hours the condenser hot well contaminated with sea water so requested the Unit Forced Shut Down.

After repair on the Condenser Tubes, the Unit was progress to light off (firing) with flushing boiler tube until parameter chemist on the range.





Method of flushing as picture below is step one for created the pressurize steam on the boiler tubes.




Method of flushing as picture below is step two for depressurize steam by open HP by-pass valve and drained into condenser blow off valve.



Repeat to step one until chemist parameters met.

2 comments:

  1. They want to loan cash just to those with high FICO scores and once in a while loan unsecured assets that are not upheld by a substantial resource or some type of huge security.

    ReplyDelete
  2. I am happy to find this post Very useful for me, as it contains lot of information. I Always prefer to read The Quality and glad I found this thing in you post. Thanks Mechanical contractor Calgary

    ReplyDelete